Beer lifecycle

From brew day to the tap

Every beer on this site is at one of these steps. The status on the home page and on each beer's page tells you which one.

Step 1 · Planned, then brewed

Brew Schedule

A brew day goes on the calendar. On the day, crushed grain soaks in hot water to make a sweet liquid called wort. The wort boils for about an hour while the hops go in, then it's chilled and run into a unitank. The yeast goes in, and the batch gets its name: the brew date plus the style, like 20261004_Saison.

On the site: Brew schedule and Events.

Step 2 · In a unitank

Fermenting

The yeast eats the sugar and makes alcohol and CO₂. A floating hydrometer in the tank reports the gravity (how much sugar is left) and the temperature every few minutes. On the home page, the bubbles in a tank show how hard the yeast is working.

On the site: Fermenting list and the unitanks.

Step 3 · In a keg, not pouring yet

On Deck

The beer moves from the tank into kegs. Every keg has its own number, like K01, that stays with the keg wherever it goes. A keg's spot in a kegerator has a name too, like TAP-1, and that spot has its own scale and gas line.

On the site: On deck list and the keg pictures.

Step 4 · Cold, carbonated and pouring

On Tap

The keg is in a kegerator at serving temperature, carbonated and hooked to a tap. The Primary Kegerator has three taps, TAP-1 to TAP-3 from left to right. The Secondary Kegerator has a spot for each of its three kegs but only one tap. When the same beer is in more than one keg, the On Tap list says there's another keg On Deck.

On the site: Kegs on tap list.

Step 5 · All gone

Past batches

When the last keg is empty, the beer stays in Beers with its recipe, numbers and fermentation chart. Kegs taken to a pop-up are listed under Events with how much was poured. If the recipe is on the brew schedule again, the beer's page says so.

On the site: Beers, Recipes and Events.

Ready-by dates

Ready-by dates are estimates, worked out every 10 minutes from the latest readings:

If a number the estimate needs isn't recorded, the date shows N/A.

See what's on tap now